Archives

Monthly Archive for: ‘March, 2011’

Cloncurry DA Services

PSA consulting are currently engaged by Cloncurry Shire Council to undertake the assessment of Development Applications (DA) lodged with the Council. The PSA engagement includes the production of reports and correspondence that is needed to fulfil Council’s obligation to comply with the Sustainable Planning Act (SPA), and particularly to meet the timeframes and requirements of the different stages of the …

Read More

Narangba East Local Development Area Plan

PSA Consulting has been commissioned by Moreton Bay Regional Council to develop the Narangba East Local Development Area Plan (NELDAP).  Once finalised, NELDAP will ensure a co-ordinated approach to the protection of the green space network, the development of residential and commercial areas and the delivery of infrastructure and services. The Narangba East Study Area is located towards the northern …

Read More

Greenfield Urban Development Areas (UDAs) Development Schemes

PSA Consulting has been engaged by ENERGEX to provide assistance with input into the four Greenfield Urban Development Areas (UDA’s) of Greater Flagstone, Yarrabilba, Ripley Valley and Caloundra South.  Under the Urban Land Development Authority Act 2007, a development scheme is required to be prepared for each UDA.  It will be important for ENERGEX that the new development schemes achieve …

Read More

Cloncurry Load-Out Facility

PSA Consulting has been engaged by Cloncurry Shire Council to review proposed load out facility locations and provide a comparative assessment with respect to the State and Local planning requirements. The proposed Cloncurry Load Out Facility was considered necessary due the logistic requirements of the Shire’s significant mining and extractive industries.  The Load Out Facility will service numerous mines within …

Read More